
A brew was tackled next before we decided what would be the tasks of the day, after a bit of discussion it was decided to fabricate a bracket on which to mount a floodlight.
The appropriate measurements were taken and a bracket was made and painted black ready to mount the floodlight on next week, once we have located where our tower scaffold has dissapeared to.

This floodlight will then light up an area up to the front entrance of The Trackside and mainly illuminate an area leading down to the staff toilets in Bury Bolton Street Station, ready for the numerous people who will be congregating in this area on the night of the Raise The Roof 3 Concert.

After lunch we recovered the trunking lids which required painting a shade of cream before being fitted onto the trunking in which Bury Bolton Street Station was rewired. The trunking lids were left out to dry in the sunshine, hopefully they will dry overnight, can someone ensure their safety and store them outside our workshop and not to damage the paintwork.
Unfortunately we ran short of cream paint, so there are still eight left to paint if the kind Mr. Johnson can provide us with a little bit more paint.
We managed to paint twenty seven of the lids.

That was it for another week.