The Electrical Volunteers Report Sunday 3rd Nov 2013
Posted: Mon Nov 04, 2013 11:48 am
Today there were me ,Clive, John and Len. Me and Len tested the fire alarms as usual.
The gang spent most of the day completing the installation of the two 6 foot light fittings in a shipping container at Barron Street. This job was started last week.
We replaced a light tube in the front model railway shop. We had a look at a light in the ELRPS building. We will have to get Simon to order some more 2D type tubes.
One member’s birthday was celebrated with a chocolate caterpillar cake with a musical candle on top. Next week we may start to put some Christmas lights up.
The gang spent most of the day completing the installation of the two 6 foot light fittings in a shipping container at Barron Street. This job was started last week.
We replaced a light tube in the front model railway shop. We had a look at a light in the ELRPS building. We will have to get Simon to order some more 2D type tubes.
One member’s birthday was celebrated with a chocolate caterpillar cake with a musical candle on top. Next week we may start to put some Christmas lights up.