Electrical Volunteer's Report Sunday 2nd June 2013
Posted: Mon Jun 03, 2013 9:52 am
On Saturday I came in and did a bit more work on the carriage connectors.
On Sunday there was me, Clive, John and Simon (the full timer). We tested the fire alarms as usual. We then went into the undercroft to complete the installation of new lights to illuminate an area that is to be used as a store. We fixed a 6 ft fitting onto the wall of a dark gloomy chamber and ran the cable back to one of the fittings that had been installed last week. The cable was clipped to the brick arched ceiling using ‘P’ clips and wall plugs.
Job complete, we knocked off for dinner. After dinner we went onto the overbridge and changed some failed lighting tubes. Clive then sorted out a problem with the cordless phones on platforms 3 & 4. I went to the steam shed to look at a reported light failure in the men’s toilet. Next week we will need to go back with a 2 ft tube.
We had a brew and then knocked off for another week.
On Sunday there was me, Clive, John and Simon (the full timer). We tested the fire alarms as usual. We then went into the undercroft to complete the installation of new lights to illuminate an area that is to be used as a store. We fixed a 6 ft fitting onto the wall of a dark gloomy chamber and ran the cable back to one of the fittings that had been installed last week. The cable was clipped to the brick arched ceiling using ‘P’ clips and wall plugs.
Job complete, we knocked off for dinner. After dinner we went onto the overbridge and changed some failed lighting tubes. Clive then sorted out a problem with the cordless phones on platforms 3 & 4. I went to the steam shed to look at a reported light failure in the men’s toilet. Next week we will need to go back with a 2 ft tube.
We had a brew and then knocked off for another week.