The Electrical Volunteers Report Sunday 5-12-2021

Post Reply
marflow
Posts: 137
Joined: Fri Nov 21, 2008 5:22 pm
Location: The Cubbyhole platf. 2

The Electrical Volunteers Report Sunday 5-12-2021

Post by marflow »

Just Colin, Jonathan and myself today.
It was mighty cold.
So 1st job, organise a brew.
Then took two repaired Chrimbo light controllers to the overbridge. Someone had already replaced them. So we left them in a bag with a note, with the banks of controllers on top of the store room. Hope the Chrimbo light putter upper finds them!
Then to platform 3/4 to sort out the lights at the south end. Got the keys to the mains cabinet in the disabled loo and waited for ages for the loo to be free. Couldn't find anything wrong. Then Geoff, our good 'ole Station Master, told us he'd already sorted it out. Never mind.
Then to STD4 to assess a coolant pump on a lathe that needed connecting up. It turned out to be straight forward so we did it there and then. It even rotated the right way.
Lunch and brew.
To Tate Towers to fix the heaters in the mess room. Someone had already been to see to them.
And an early finish.