ELECTRICAL VOLUNTEERS REPORT SUNDAY 24th JULY 2016
Me and Len tested the fire alarm on the over-bridge and booking hall. We have been informed that the two eight foot light fittings over the lathes in the Standard 4 shed are inadequate. We blamed the years of accumulated dust, so we took a step ladder and a rag to clean the eight foot tubes and fitt...
- Mon Jul 11, 2016 12:49 pm
- Forum: Electrical
- Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 10th JULY 2016
- Replies: 1
- Views: 3754
ELECTRICAL VOLUNTEERS REPORT SUNDAY 10th JULY 2016
Today it was me, Alan and Clive. We tested the fire alarms as usual. Today’s job was replacing the two outdoor flood lights just below the roof of the Standard 4 shed, one on the North end of the shed and one on the South end. The lights illuminate the official walk way and are controlled by a photo...
- Mon May 09, 2016 1:18 pm
- Forum: Electrical
- Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 8th MAY 2016
- Replies: 1
- Views: 3710
ELECTRICAL VOLUNTEERS REPORT SUNDAY 8th MAY 2016
Today there were four of us, me, Len, Clive and John. Me and Len tested fire alarms as usual. We did some tidying up jobs before going to the Standard Four shed. We had been informed that there was a light out. After some confusion it was found to be an 8ft tube over one of the lathes. We changed th...
- Mon Mar 07, 2016 12:04 pm
- Forum: Electrical
- Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 6th MARCH
- Replies: 0
- Views: 3439
ELECTRICAL VOLUNTEERS REPORT SUNDAY 6th MARCH
Today it was me, Alan, Len and John. The fire alarms were tested as usual. The 1950s clock for the Trackside that we assembled last week was found to be keeping good time. We assembled and tested the last of the three refurbished light fittings for under the canopy at Rammy, just in time to miss the...
- Mon Feb 29, 2016 12:27 pm
- Forum: Electrical
- Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 28th FEBRURY
- Replies: 1
- Views: 3825
ELECTRICAL VOLUNTEERS REPORT SUNDAY 28th FEBRURY
Today we had a full house. The fire alarms were tested as usual. The day was fine but cold so we spent most of it in close proximity to the heaters, kettle and shortbread biscuits. Clive went to Summerseat for about an hour with Simon to sort out a problem on the platform lights control system. Jobs...
- Mon Feb 22, 2016 3:18 pm
- Forum: Electrical
- Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 21st FEBRURY
- Replies: 5
- Views: 7984
ELECTRICAL VOLUNTEERS REPORT SUNDAY 21st FEBRURY
I came in on Saturday. I cleaned and painted the three light fittings that we took down last week from under the canopy at Rammy. On Sunday we had a full house. The fire alarms were tested as usual. The Rawtenstall Christmas lights had been taken down by a member of paid staff who will remain namele...
- Mon Feb 15, 2016 3:45 pm
- Forum: Electrical
- Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 14th FEBRUARY
- Replies: 1
- Views: 3562
ELECTRICAL VOLUNTEERS REPORT SUNDAY 14th FEBRUARY
Today there were me, Alan, Clive and John. After a morning brew we loaded the scaffolding onto the train along with the three light fittings that we refurbished a couple of weeks ago. We went to Rammy. We re-installed the three fittings under the canopy and took the other three down for refurbishmen...
- Mon Feb 08, 2016 11:59 am
- Forum: Electrical
- Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 7th FEBRURY
- Replies: 0
- Views: 3191
ELECTRICAL VOLUNTEERS REPORT SUNDAY 7th FEBRURY
I came in on Saturday. I sanded down and painted the three light fittings from under the canopy at Rammy. On Sunday there was me, Clive and John. We tested the fire alarms as usual. We re- assembled the fittings that I had painted yesterday, we put LED tubes in them and tested them. It had been repo...
- Mon Jan 04, 2016 11:52 am
- Forum: Electrical
- Topic: The Electrical Volunteers Report Sunday 3rd January 2016
- Replies: 5
- Views: 7802
The Electrical Volunteers Report Sunday 3rd January 2016
Today it was me, Len, John and Clive. Alan is visiting relations. The fire alarms were tested as usual. We took down the Christmas lights, strung between lamp posts on platform 2 BBS and packed them into their metal box. We then loaded two boxes, a trolley and the tall step ladders onto the train fo...
- Mon Nov 09, 2015 12:18 pm
- Forum: Electrical
- Topic: Electrical Volunteers Report Sunday 8th Nov 2015
- Replies: 4
- Views: 6476
Electrical Volunteers Report Sunday 8th Nov 2015
Today it was me, Len, Clive and John. The fire alarms were tested as usual. The main job today was putting the Christmas lights up at Rammy. The scaffolding and boxes of lights were loaded onto the DMU. The weather was wet and miserable. By the time we got to Rammy it had just about stopped raining....
- Mon Oct 26, 2015 2:52 pm
- Forum: Electrical
- Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 25th OCTOBER 2015
- Replies: 0
- Views: 3002
ELECTRICAL VOLUNTEERS REPORT SUNDAY 25th OCTOBER 2015
The fire alarms were tested as usual. Me, Len, Clive and John took the scaffolding across the line and erected it on platform 3 & 4. We installed and connected the two remaining lamp post heads on top of the lamp posts. We then completed the fixing of new earthing points on the lamp posts. To st...
- Mon Oct 12, 2015 1:44 pm
- Forum: Electrical
- Topic: The Electrical Volunteers Report Sunday 11th Oct 15
- Replies: 1
- Views: 3491
The Electrical Volunteers Report Sunday 11th Oct 15
Today it was me, Clive, John and Len. The fire alarms were tested a usual. The job today was fixing the refurbished lamp post heads (with LED tubes fitted) to the tops of the lamp posts on the end of platform 3 & 4. The day was one of snags and problems. We wanted to use the tall alluminium step...
- Mon Aug 31, 2015 1:02 pm
- Forum: Electrical
- Topic: SUNDAY VOLUNTEERS REPORT 30/08/15
- Replies: 0
- Views: 3110
SUNDAY VOLUNTEERS REPORT 30/08/15
Today it was me, Clive, John and Len. The fire alarms were tested as usual. We then retreated to the workshop away from the crowds for the rest of the day. The standard 4 shop had given us three, model electric train controllers to be PAT tested before putting them on sale to the public. These were ...
- Mon Aug 17, 2015 11:34 am
- Forum: Electrical
- Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 16 AUG 2015
- Replies: 0
- Views: 3022
ELECTRICAL VOLUNTEERS REPORT SUNDAY 16 AUG 2015
Me and Len tested the fire alarms as usual. Alan is at a football match today. Me, Len, John and Clive went to Carriage & Wagons to continue with the job we started last week : converting the fluorescent fittings into LED fittings by disconnecting the electronic ballast units and connecting one ...
- Mon Apr 06, 2015 1:19 pm
- Forum: Electrical
- Topic: THE ELECTRICAL VOLUNTEERS' REPORT SUNDAY 05-04-15
- Replies: 0
- Views: 2802
THE ELECTRICAL VOLUNTEERS' REPORT SUNDAY 05-04-15
I was the only one working today. The others had declared a holiday. A 16 amp extension lead (for carriage battery charging) had been left for repair. It had twice been run over by a train. This is a common occurrence. I cut out the damaged bit in the middle and made two shorter leads out of one lon...