The Electrical Volunteers Report Sunday 04-12-2022.

Posted: Sun Dec 04, 2022 6:49 pm
by asbibby
8) Today on a very damp day i was joined by Clive and Jonathan, we had a welcome brew before starting work.
Clive wired up three lighting ends for use on converting fluorescent tubes to LED tubes, these where to be used in the Bury Standard 4 Group workshop at the end of platform two at Bury Bolton Street Station, :idea:
We converted two eight foot fluorescent fittings to accommodate six foot LED tubes above two of the bays were the machine tools are utilised. :)

Lunch and a brew was had in the BS4G workshop, we then converted another eight fluorescent fitting in bay three to accommodate a six foot LED tube, all the lights were then tested and worked OK. :idea:
We have one more fitting to convert in bay three, this will be done next Sunday. :)

Whilst in the BS4G workshop we were asked to have a look at a couple of hand held 240volt electric drills, one did not work at all and will be stripped at a later date, the other drill worked after releasing a speed control button on the drill.
Both will be PAT tested before being put back into use. :P

A final brew was had with mince pies supplied very kindly by Sue Sue.

We shall be back next week with more electrical moments to treasure. 8)