Page 1 of 1

The Electrical Volunteers Report Sunday 18-06-2017.

Posted: Mon Jun 19, 2017 12:29 pm
by asbibby
:D All five electrical volunteers reported for duty in our workshop at Bury Bolton Street station, after a brew it was decided that Clive, Len & John would gather some tools and to catch the next train to Rawtenstall Station to recover the last two lamp heads to be refurbished. :shock:

We recovered the the six lamp heads from storage which had been cleaned, sanded down & painted white last week, Jonathan got on with painting the lamp heads in black smooth rite paint. :)

I got on with stripping down the Smiths Speedo Regulator & Cabling, the unit took some stripping down has it probably not been touched for many years.
The connecting copex stainless steel cable was fitted with a length of heat shrink tubing where the metal shielding had been damaged. :P

layers of paint applied over many years was chipped off the casing a lid of the regulator ready for a final application of Nitromors next week to remove the last vestiges of paint. The unit will then be painted in a light grey colour and tested before being fitted on The Bury Standard 4 Group engine 80097, this will replace a regulator which had been refurbished last year and fitted on the engine, were it went is still a mystery. :x

Clive, Len & John returned to our workshop and began stripping down ready for painting to two lamp heads recovered from Rawyenstall Station. :)

We had a final brew with a piece of songs cake each provided by John, before leaving for home. :D

Next week we should be able to install the six lamp heads from Rawtenstall Station which have now been refurbished in our
workshop.