The Electrical Volunteers Report Sunday 21-08-2022.

Post by asbibby »

Another lovely sunny day down on the East Lancashire Railway, John, Colin, Sophie, Jonathan and Stephen joined me today to make up the electrical volunteers team.
We all had a breakfast sandwich and a brew outside our workshop before starting today’s tasks. :D

Jonathan and Colin went off to do the fire alarm call point checks at BBS Station, all was well and the result logged. :)

We went to the Bury Standard 4 Group shop to inspect the one metre high walkway, which is constructed using scaffolding poles and clamps.

The four lamp heads we had refurbished last Sunday were re-assembled, then tested, before loading all our tools, lamp heads and ladders on the 11:55 train to Summerseat Station.
On arrival we unloaded all our equipment and set about re-installing the lamp heads and removing another three lamp heads for refurbishment back in our workshop.
:idea:
On arrival back in BBS we unloaded all our gear and stripped the three lamp heads down and sanded them ready for painting next Sunday. :D

We had a final brew and some cakes provided by Sue and Stephen, before packing all our stuff away and logging off for the day. :)