The Electrical Volunteers Report Sunday 23 March 2014

Post by JONATHAN-BARNES »

I came in on Saturday, cleaned and painted three lamp post heads from Rammy.

On Sunday me, Len and John assembled the lamp post heads, tested them and took them to Rammy. We re-installed them on platform 1 lamp posts. We had dinner in front of fire in Rammy waiting room. After dinner we loaded three more lamp post heads onto a train and took them back to Bury for cleaning and painting.

After a brew we stripped the heads down ready for painting.

At the request of a working member we re-connected the flex onto an electric drill and PAT tested it.

That was it for another day.