Search found 26 matches

by mike-smashing
Tue Jun 11, 2013 11:50 am
Forum: Electrical
Topic: The Electrical Volunteers Report Sunday 09-6-2013.
Replies: 5
Views: 6060

Re: The Electrical Volunteers Report Sunday 09-6-2013.

It is a pity that the state of this gents toilet facility at Baron Street is in such a state, it is not fit for purpose at present, the toilet ceiling is covered in cob webs, the paint is peeling off the walls, discarded toilet rolls litter the place, toilet cubicles are very dirty and the toilet b...
by mike-smashing
Sat Sep 01, 2012 7:55 am
Forum: Electrical
Topic: Howson Bar E1871
Replies: 7
Views: 9260

Re: Howson Bar E1871

Will the Howson Bar be able to be modified so that more use of it as a buffet can be made? It can be used as a buffet right now. It has a perfectly good counter and servery area, that in some respects is superior to the other RMBs - i.e. it's lockable! It's been fitted with a trickle charger so tha...
by mike-smashing
Sat Sep 01, 2012 6:54 am
Forum: Electrical
Topic: Howson Bar E1871
Replies: 7
Views: 9260

Re: Howson Bar E1871

Aidy, thanks for the detailed description of how Deltic ETH is derived from the generators. I always knew it was an unstable voltage because of how it was fed from the main gens, but never really understood exactly why. Learn something new every day... :) For those interested, there's quite a bit of...
by mike-smashing
Fri Aug 31, 2012 12:07 am
Forum: Electrical
Topic: Howson Bar E1871
Replies: 7
Views: 9260

Re: Howson Bar E1871

Well, there's a few things which favour equipping 1871 with a generator. I understand there's been investigations into: a) Reinstating a propane-powered galley - apparently difficult because of the mods made by Intercity when 1871 was re-engineered in the 90s to have an electric galley. This also do...
by mike-smashing
Mon Jun 18, 2012 2:03 pm
Forum: Electrical
Topic: The Electrical Volunteers Report Sunday 17-6-2012.
Replies: 3
Views: 4324

Re: The Electrical Volunteers Report Sunday 17-6-2012.

Lunch was then taken back in our workshop at BBS with chocolates provided by Len's wife. <snip> We went back to our workshop for a brew and to finish of some chocolate proffiteroles that I had brought in. Do I detect an arms-race brewing between Electrical and Pway on who has the best cakes and pas...
by mike-smashing
Fri May 18, 2012 7:41 pm
Forum: Electrical
Topic: The Electrical Volunteers Report Sunday 6-5-2012.
Replies: 5
Views: 5867

Older hand dryers are designed around a stream of warm air to dry the hands, as opposed to airflow, and have quite substantial heating elements in as a result. More modern, energy efficient dryers use the speed of the air to accelerate the evaporation of the water from the hands, as opposed to heat,...
by mike-smashing
Thu Jul 07, 2011 10:15 pm
Forum: Links
Topic: Summer Diesel Gala
Replies: 1
Views: 3699

Great photos of the Sunday's workings there, Ian.

Thanks for the link.

Mike
by mike-smashing
Thu Jul 07, 2011 9:44 pm
Forum: Links
Topic: TONIGHT on ITV
Replies: 6
Views: 6470

I do wonder sometimes if people ever look for the wider picture before thinking things are suppressed! It's a commercial contract generating revenue for the railway - and that helps in allowing us to operate this fantastic railway. That's what I was getting at Andy. They've paid their money, so it'...
by mike-smashing
Thu Jul 07, 2011 8:37 pm
Forum: Links
Topic: TONIGHT on ITV
Replies: 6
Views: 6470

Again though, why didn't the ELR get mentioned as the place Sapper was visiting? I suspect the TV production company paid the railway well for the use of the ELR as a nice backdrop of "old trains". They will be paying to film on the railway, so it's therefore up to them, not the ELR, whet...
by mike-smashing
Mon Jul 04, 2011 4:28 pm
Forum: Electrical
Topic: The Electrical Volunteers Report Sunday 3-7-2011.
Replies: 4
Views: 4253

I will check the vehicle number tomorrow but the carriage we are working on and referred to here is an ex-Regional Railways BSO. It is very close to the gate to Baron Street behind C & W and has been buried down there for a number of years. Ah, that one is Mk2a BSO 9418. 8) Sounds like two proj...
by mike-smashing
Mon Jul 04, 2011 10:20 am
Forum: Electrical
Topic: The Electrical Volunteers Report Sunday 3-7-2011.
Replies: 4
Views: 4253

Re: The Electrical Volunteers Report Sunday 3-7-2011.

Well the surprise was down at the Carriage & Wagon sidings in the shape of W5017 a MK1 TSO which is used on the Santa formation this being two by two seating with a central isle and dual heating, electric/steam. I think you mean W5031. It often sees year round use. I wondered why it was stabled...
by mike-smashing
Mon Apr 11, 2011 7:36 pm
Forum: Mainline workings
Topic: 55022 to work blythe alacan trains
Replies: 10
Views: 26371

47406 wrote: Will it be D9016 on its own for the Easter weekend now?
No, Martin assures us that RSG will be back on ELR metals for the Easter weekend, and available for other existing mainline commitments - see http://royalscotsgrey.wordpress.com/

Mike
by mike-smashing
Fri Mar 11, 2011 7:57 pm
Forum: Electrical
Topic: The Electrical Volunteers' Report Sunday 13-02-2011
Replies: 8
Views: 7149

Re: The Electrical Volunteers' Report Sunday 13-02-2011

marflow wrote: Can any guards report on whether or not the Summerseat platform lights are working properly?
Clive, just last weekend, at the diesel gala, I noticed the Summerseat lights going on and off in the middle of the day on Sunday, when passing through with a train.

Mike
by mike-smashing
Mon Sep 27, 2010 10:54 am
Forum: Electrical
Topic: The Electrical Volunteers Report Sunday 26-9-2010.
Replies: 11
Views: 10014

rmb wrote:Well done you Bibby Boys. If a job's worth doing it's worth doing well.
Sounds good to me - lots of progress being made to more servicable stock by the sound of it.

Mike
by mike-smashing
Tue Sep 21, 2010 3:05 pm
Forum: Electrical
Topic: The Electrical Volunteers Report Sunday 19th. September 2010
Replies: 10
Views: 8992

Re: Batteries.

The electrical workshop is located under the stairs at BBS, is there a duplicate of the defects report, one of which will stay in the book and the other one can then be put in an envelope and posted underneath our door, marked up for the Electrician's attention. This way we will get to know of any ...