Search found 32 matches

by JONATHAN-BARNES
Mon Jul 25, 2016 1:10 pm
Forum: Electrical
Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 24th JULY 2016
Replies: 2
Views: 3758

ELECTRICAL VOLUNTEERS REPORT SUNDAY 24th JULY 2016

Me and Len tested the fire alarm on the over-bridge and booking hall. We have been informed that the two eight foot light fittings over the lathes in the Standard 4 shed are inadequate. We blamed the years of accumulated dust, so we took a step ladder and a rag to clean the eight foot tubes and fitt...
by JONATHAN-BARNES
Mon Jul 11, 2016 12:49 pm
Forum: Electrical
Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 10th JULY 2016
Replies: 1
Views: 2976

ELECTRICAL VOLUNTEERS REPORT SUNDAY 10th JULY 2016

Today it was me, Alan and Clive. We tested the fire alarms as usual. Today’s job was replacing the two outdoor flood lights just below the roof of the Standard 4 shed, one on the North end of the shed and one on the South end. The lights illuminate the official walk way and are controlled by a photo...
by JONATHAN-BARNES
Mon May 09, 2016 1:18 pm
Forum: Electrical
Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 8th MAY 2016
Replies: 1
Views: 2828

ELECTRICAL VOLUNTEERS REPORT SUNDAY 8th MAY 2016

Today there were four of us, me, Len, Clive and John. Me and Len tested fire alarms as usual. We did some tidying up jobs before going to the Standard Four shed. We had been informed that there was a light out. After some confusion it was found to be an 8ft tube over one of the lathes. We changed th...
by JONATHAN-BARNES
Mon Mar 07, 2016 12:04 pm
Forum: Electrical
Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 6th MARCH
Replies: 0
Views: 2817

ELECTRICAL VOLUNTEERS REPORT SUNDAY 6th MARCH

Today it was me, Alan, Len and John. The fire alarms were tested as usual. The 1950s clock for the Trackside that we assembled last week was found to be keeping good time. We assembled and tested the last of the three refurbished light fittings for under the canopy at Rammy, just in time to miss the...
by JONATHAN-BARNES
Mon Feb 29, 2016 12:27 pm
Forum: Electrical
Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 28th FEBRURY
Replies: 1
Views: 3150

ELECTRICAL VOLUNTEERS REPORT SUNDAY 28th FEBRURY

Today we had a full house. The fire alarms were tested as usual. The day was fine but cold so we spent most of it in close proximity to the heaters, kettle and shortbread biscuits. Clive went to Summerseat for about an hour with Simon to sort out a problem on the platform lights control system. Jobs...
by JONATHAN-BARNES
Mon Feb 22, 2016 3:18 pm
Forum: Electrical
Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 21st FEBRURY
Replies: 5
Views: 6244

ELECTRICAL VOLUNTEERS REPORT SUNDAY 21st FEBRURY

I came in on Saturday. I cleaned and painted the three light fittings that we took down last week from under the canopy at Rammy. On Sunday we had a full house. The fire alarms were tested as usual. The Rawtenstall Christmas lights had been taken down by a member of paid staff who will remain namele...
by JONATHAN-BARNES
Mon Feb 15, 2016 3:45 pm
Forum: Electrical
Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 14th FEBRUARY
Replies: 1
Views: 2916

ELECTRICAL VOLUNTEERS REPORT SUNDAY 14th FEBRUARY

Today there were me, Alan, Clive and John. After a morning brew we loaded the scaffolding onto the train along with the three light fittings that we refurbished a couple of weeks ago. We went to Rammy. We re-installed the three fittings under the canopy and took the other three down for refurbishmen...
by JONATHAN-BARNES
Mon Feb 08, 2016 11:59 am
Forum: Electrical
Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 7th FEBRURY
Replies: 0
Views: 2587

ELECTRICAL VOLUNTEERS REPORT SUNDAY 7th FEBRURY

I came in on Saturday. I sanded down and painted the three light fittings from under the canopy at Rammy. On Sunday there was me, Clive and John. We tested the fire alarms as usual. We re- assembled the fittings that I had painted yesterday, we put LED tubes in them and tested them. It had been repo...
by JONATHAN-BARNES
Mon Jan 04, 2016 11:52 am
Forum: Electrical
Topic: The Electrical Volunteers Report Sunday 3rd January 2016
Replies: 5
Views: 6302

The Electrical Volunteers Report Sunday 3rd January 2016

Today it was me, Len, John and Clive. Alan is visiting relations. The fire alarms were tested as usual. We took down the Christmas lights, strung between lamp posts on platform 2 BBS and packed them into their metal box. We then loaded two boxes, a trolley and the tall step ladders onto the train fo...
by JONATHAN-BARNES
Mon Nov 09, 2015 12:18 pm
Forum: Electrical
Topic: Electrical Volunteers Report Sunday 8th Nov 2015
Replies: 4
Views: 5233

Electrical Volunteers Report Sunday 8th Nov 2015

Today it was me, Len, Clive and John. The fire alarms were tested as usual. The main job today was putting the Christmas lights up at Rammy. The scaffolding and boxes of lights were loaded onto the DMU. The weather was wet and miserable. By the time we got to Rammy it had just about stopped raining....
by JONATHAN-BARNES
Mon Oct 26, 2015 2:52 pm
Forum: Electrical
Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 25th OCTOBER 2015
Replies: 0
Views: 2449

ELECTRICAL VOLUNTEERS REPORT SUNDAY 25th OCTOBER 2015

The fire alarms were tested as usual. Me, Len, Clive and John took the scaffolding across the line and erected it on platform 3 & 4. We installed and connected the two remaining lamp post heads on top of the lamp posts. We then completed the fixing of new earthing points on the lamp posts. To st...
by JONATHAN-BARNES
Mon Oct 12, 2015 1:44 pm
Forum: Electrical
Topic: The Electrical Volunteers Report Sunday 11th Oct 15
Replies: 1
Views: 2915

The Electrical Volunteers Report Sunday 11th Oct 15

Today it was me, Clive, John and Len. The fire alarms were tested a usual. The job today was fixing the refurbished lamp post heads (with LED tubes fitted) to the tops of the lamp posts on the end of platform 3 & 4. The day was one of snags and problems. We wanted to use the tall alluminium step...
by JONATHAN-BARNES
Mon Aug 31, 2015 1:02 pm
Forum: Electrical
Topic: SUNDAY VOLUNTEERS REPORT 30/08/15
Replies: 0
Views: 2543

SUNDAY VOLUNTEERS REPORT 30/08/15

Today it was me, Clive, John and Len. The fire alarms were tested as usual. We then retreated to the workshop away from the crowds for the rest of the day. The standard 4 shop had given us three, model electric train controllers to be PAT tested before putting them on sale to the public. These were ...
by JONATHAN-BARNES
Mon Aug 17, 2015 11:34 am
Forum: Electrical
Topic: ELECTRICAL VOLUNTEERS REPORT SUNDAY 16 AUG 2015
Replies: 0
Views: 2421

ELECTRICAL VOLUNTEERS REPORT SUNDAY 16 AUG 2015

Me and Len tested the fire alarms as usual. Alan is at a football match today. Me, Len, John and Clive went to Carriage & Wagons to continue with the job we started last week : converting the fluorescent fittings into LED fittings by disconnecting the electronic ballast units and connecting one ...
by JONATHAN-BARNES
Mon Apr 06, 2015 1:19 pm
Forum: Electrical
Topic: THE ELECTRICAL VOLUNTEERS' REPORT SUNDAY 05-04-15
Replies: 0
Views: 2167

THE ELECTRICAL VOLUNTEERS' REPORT SUNDAY 05-04-15

I was the only one working today. The others had declared a holiday. A 16 amp extension lead (for carriage battery charging) had been left for repair. It had twice been run over by a train. This is a common occurrence. I cut out the damaged bit in the middle and made two shorter leads out of one lon...